by ImOK Webmaster | May 5, 2025
A compacted concrete spillway and massive headworks was constructed for the Walker River Irrigation District on the Walker river, near Topaz lake. MKD construction performed mass earth moving, structural concrete work, including installing a portable batch plant. The...
by ImOK Webmaster | May 5, 2025
Summer of 2018 MKD Construction constructed a project for Tahoe City Public Utility District located in California. The project involved many stake holders and was considered a high profile project. The project involved upgrading and replacing a multi-use path that...
by ImOK Webmaster | May 5, 2025
This job consisted of repairing road damages from intense rainfall and flooding, which included, drainage & slope improvements. The repair work included roadway excavation, ditch excavation, roadway embankment, 18” CMP culvert, underdrains, shoulder backing,...
by ImOK Webmaster | May 5, 2025
During the summer of 2019, MKD removed a substandard ten foot by six foot double RCB (reinforced concrete box) and installed a new double ten-foot by six-foot RCB. The crews lengthened the span of the box culvert thus widening the road, then installed cast in place...
by ImOK Webmaster | May 5, 2025
Located on the East fork of the Walker River in Yerington, Nevada, we replaced this bridge for the Nevada Department of Transportation. The job was valued at $2,200,000. This new bridge provides a safer crossing for the newest state recreation area, Walker River State...