Our Construction Portfolio
A Sampling of Previous Projects
Previous Projects
Jack Creek Reinforced Concrete Box, Elko County, Nevada
During the summer of 2019, MKD removed a substandard ten foot by six foot double RCB (reinforced concrete box) and installed a new double ten-foot by six-foot RCB. The crews lengthened the span of the box culvert thus widening the road, then installed cast in place...
Minister Bridge, Yerington, NV
Located on the East fork of the Walker River in Yerington, Nevada, we replaced this bridge for the Nevada Department of Transportation. The job was valued at $2,200,000. This new bridge provides a safer crossing for the newest state recreation area, Walker River State...

